Fourteen checkpoints across five phases, each with the document that proves it was done — the checklist we run before any mixed-SKU order leaves the cluster.
2026-09-10 · 6 min read · Reference guide

Lighting projects rarely fail at the product — they fail in the gaps between phases: a survey that missed the ceiling type, a layout approved in a screenshot, a golden sample nobody kept, a container loaded without a plan. This checklist compresses the project path into fourteen checkpoints, each with the deliverable that should exist before the next phase starts. Use it as the agenda for your supplier calls and the attachment to your purchase order; a supplier who resists producing the evidence at any row is telling you something.
| # | Phase | Checkpoint | Deliverable |
|---|---|---|---|
| 1 | Site survey | Room dimensions, ceiling types and mounting heights recorded | Survey sheet with marked-up plan |
| 2 | Site survey | Existing illuminance measured where retrofitting | Baseline lux readings per zone |
| 3 | Site survey | Electrical capacity, switching and control routes noted | DB schedule and control riser notes |
| 4 | Design | Target lux, CCT, CRI and UGR agreed per room type | One-page design brief, signed |
| 5 | Design | Dialux/relux layout run per zone with uniformity checked | Calculation file, not screenshots |
| 6 | Design | Fixture schedule fixed: model, lumens, watts, IP, driver brand | Schedule BOM referenced in the PO |
| 7 | Sampling | Golden sample approved, sealed and labelled with date | Signed sample + photos on file |
| 8 | Sampling | CCT bin and CRI verified against the golden sample | Bin report per production batch |
| 9 | Production | First-article inspection before mass run | FAI report with dimensions and weight |
| 10 | Production | In-line QC: driver brand, cable, IP seals against BOM | QC log by batch number |
| 11 | Pre-shipment | AQL inspection with lit test after full production | PSI report; payment tied to it |
| 12 | Packing | Carton spec and drop test confirmed for the fragility class | Carton spec sheet + test report |
| 13 | Loading | Container inspected, loading plan followed, photos taken | Loaded-by and loading report |
| 14 | Documents | Certificates, test reports, manuals packed and archived | Document pack per shipment |
Phases typically run: sampling 7-14 days after drawings freeze; bulk production 25-40 days after deposit and sample approval; PSI at 100% completion. Illustrative durations for standard commercial volumes.
If the full list is too heavy for a small order, these four carry most of the protection. Row 5, the calculation file: a supplier willing to share the dialux file is quoting a result, not a box count — and it is the document that settles uniformity disputes later. Row 7, the sealed golden sample: every later argument about colour, finish or beam is settled by holding it against the batch. Row 11, PSI at 100% completion: an inspection booked before production finishes routinely inspects cartons of nothing. Row 13, the loading report: mixed-SKU damage is almost always a loading decision, made in twenty minutes at the factory gate and discoverable only weeks later — our container loading guide covers that step in detail.
This checklist is the process behind every mixed-SKU order we consolidate from the cluster, whether the goods are high bays under warehouse lighting, fit-out fixtures from commercial lighting, or decorative schemes from the hotel programme. Rows 5-14 run on our side by default; rows 1-3 typically start from your site or your contractor's survey. For the supplier-vetting layer beneath this checklist — licences, sample policies, factory audits — see our 20 questions for a lighting factory and the Guzhen sourcing guide.
What to ask a lighting manufacturer before wiring money.
Mixed-SKU lighting shipments planned and documented properly.
Aisles, racks and energy math — a full project walked end to end.
How professional buyers work the lighting capital — districts, audits and export routes.
Send the project — the layout, sampling, QC and loading phases run on our side, with row-level evidence archived against your order.