Simulation before specification. Dialux studies for roads, areas and interiors, a photometric file library for tender files, and scene-based design support — free for project inquiries, with deliverables and turnaround stated up front.
| Service | Deliverables | Typical turnaround (illustrative) |
|---|---|---|
| Road & area Dialux study | Dialux report (PDF), iso-lux plots, pole layout, luminaire schedule | 3-5 working days |
| Interior simulation | Dialux evo report, per-room lux and uniformity, energy estimate | 3-5 working days |
| Full project package | Layout, luminaire schedule, photometric files, certification mapping | 5-10 working days |
| IES / LDT files | Photometric files per SKU with test references, via certified partner factories | Same or next working day |
| Tender compliance sheet | Standard-by-standard mapping with certificate numbers and database links | 1-2 working days |
Turnaround times are illustrative prototype figures — confirmed per request. Catalog IES/LDT files and datasheets are collected in the downloads center.
CAD plan, dimensions, mounting or pole heights, and the target standard or lux class — a room data sheet if you have one.
We agree lux class, uniformity, UGR and budget envelope before simulating; response within 24 hours.
Dialux report plus luminaire schedule, with one revision round included (illustrative).
The approved study becomes the BOQ — project pricing and staged delivery under the contractor terms.
Lux targets, uniformity and energy figures in a Dialux report — studies for project inquiries are free.